THINGS TO KNOW ABOUT OWNING LIVING IN HEMLOCK FARMS BUILDING DEPARTMENT Permits Needed The Building
Department is open Monday through Friday from No new
construction, including excavation, is to be undertaken until sewage permit and
a building permit are issued to and received by the owner and/or builder. Additional building permits may also be
required from the local townships. For
additional information, the HFCA Architectural and Construction Guidelines
Handbook is available from the Building Department. Waterfront
property owners are permitted to have one (1) dock. Replacement of or new docks require a
permit. The permit fee is $35.00. For more information, see Chapter 254-1 and
254-2 Waterfront and Dock Controls of the HFCA Code Book. A General Permit is required from The Pike
County Conservation District, through a delegation agreement with the
Pennsylvania Department of Environmental Protection (PA DEP). These permits are free of charge and usually
take 4 to 5 working days. Contact the
Conservation District at (570)226-8220 for the general permit. Property Erosion
Plans For any
construction requiring a building permit, an erosion control plan that
describes how erosion on the property will be controlled must be
submitted to the Building Official for approval prior to permit approval. New Homes If you are
building a new home in Hemlock Farms, the minimum square footage of living area
is 1,500 square feet. 840 square feet is
the minimum requirement on the first floor.
Building permit fees are $.55 a sq. ft. of living space. Sheds The HFCA Board of
Directors policy with respect to the construction of sheds in
lieu of a garage in Hemlock Farms allow for sheds up to 100 square feet
to be constructed provided a building permit is obtained. The fee for the permit is $35. Attached to the application must be the size
of the shed, a sketch of the shed, and where the shed will be located on the
lot. The applicant signs a binding
agreement to remove the structure should a garage be built. A zoning permit
from the township where the member resides must be obtained before an HFCA
Building Permit can be issued. Driveways The first five
(5) feet into a lot from any lot side line must not be used for driveway
and/or parking pad. No driveway and/or
parking pad shall be installed over any curbside utility vault (water, power or
telephone). No driveway
and/or parking pad shall be installed over a septic system. A driveway permit is required if you plan to
pave your driveway. The fee for the
permit is $35.00 and must be applied for in advance from the Building
Department. Decks If the property
owner plans to build a new deck or replace an existing deck, a Building Permit
is required. The permit fee is
$.40 a sq. ft. (new) and $35.00 for replacement decks (same dimensions). Building
or Buying? - Some Suggestions Building or
buying a house is a major job, which most people will not do often in their
lifetime. The HFCA Architectural
Committee offers these hints: Shop
for the builder.
Talk to all whom are available.
Study them for reliability.
Obtain a list of previous customers in the community and talk to
them. Obtain bank references and check
them. Check the builder's reputation at
local building suppliers. Don't rush to
judgment. Once you choose a
builder, make absolutely sure of what you are getting. Examine drawings and specifications in detail
for gross and net square footage; exterior and interior finishes; type of heat
and controls; size of electric services including proper number of electric
outlets in all rooms, space in the electric panel for future circuit breakers
and proper circuits for items such as electric stoves, washer-dryers, water
heaters and the like; plumbing fixtures and piping (type, size and manufacturer
and the proper size of supply piping); wall and glass insulation; liability and
other related insurance; and length of guarantee, if any. Examine your
construction contract for: rock excavation, inclusion of a completed approved
septic system, inclusion of water line costs, length of driveway, approvals by
all required agencies and paid permit fees, appliances included, lighting
fixtures and carpets. Regardless of the
builder, drawings and specifications should be reviewed by an independent
architect and/or an engineer. Any
contract should be reviewed by an attorney before signing. Shop
for your mortgage.
Interest percentages vary, as do closing costs, inspection fees and
legal fees for the bank's attorney. You
are not obligated to follow a builder's suggestion of a bank or other lender. Remember that
property ownership involves numerous costs beyond those of construction and the
purchase of land. You should be prepared
to pay operating costs such as property and liability insurance; county,
township and school taxes; interest and carrying charges; landscaping; ordinary
maintenance; utilities such as fuel, water, telephone and electric as well as
your HFCA dues. The Architectural
Committee of Hemlock Farms strongly recommends that the design and color of the
structure you are building blends with the surrounding environment. SEPTIC
MAINTENANCE - AVOIDING FAILURES IN MOUND SYSTEMS Mound systems can
have a lifetime of 50 years or more - if they are properly installed and
maintained. The most common failure in a
mound system is due to hydraulic overload (too much water). When water consumption exceeds design capacity,
soils cannot absorb or renovate the water.
Typically, in the case of hydraulic overload, water can emerge at the
ground surface at the toe of the mound.
Poor maintenance of a system will also cause failures. Solids that flow from the pump station, oil
or greasy wastes allowed to run through the
distribution lines, and faulty pumps quickly clog the already poorly perked
soil. Finally, the mound will fail if
anaerobic conditions develop (from continual wetting, biological mats form in
the mound and reduce water infiltration). As with mound
construction, a number of practices eliminate or reduce the chances of failure
in your system. The tips listed below
can help increase the life of your system. 1. Install
water saving devices. 2. Regularly
check the pump station and mound for any malfunctions. 3. Divert
surface water and roof drainage away from mound. 4.
Keep activity off of the downslope side. 5. Have
sludge removed from pumping chamber every 3 to 5 years. 6. Install
inspection vents in the mound to check for ponding. 7. Keep
deep-rooted plants like shrubs and trees off of the mound. 8.
Plant grass on the mound to
prevent surface erosion. The Association
also recommends the use of low phosphate laundry detergents to minimize environmental
impact. If you have any
questions or concerns, please feel free to contact either Sue or Jesse at the
Building Department at 570/775-0671. SEPTIC
CODE: On 1 /1 /01
a septic code (requiring inspection/pumping of all septic tanks) went into
effect for all improved properties. For
more information, please see Code 207 in the back of this Handbook. |